Commercial

Davis Moore Collision East Body Shop, Wichita, KS

Riley Construction and Varco -Pruden provided full design and development for this new 22,500 sf body shop facility in East Wichita.  Engineering costs can be saved during the design phase of a new facility by chosing pre-engineered products.

 

Interior liner panel details of a full transverse wall with full height panel and read more >>

Seaton Court Demolition – Kansas State University


Client:  Kansas State University
Location:  Manhattan, KS
Architect:  BG Consultants

Project:  Demolition and renovation of Seaton Court.  The part of Seaton being removed had been utilized for many functions for decades, and had been ruined by years of water damage.  The new “exterior” of the project was covered partially by re-purposed read more >>

Fort Riley AISBC Range Pre-Engineered Buildings

Client:   TEPA, llc.
Location:  
Fort Riley, KS

Erection of 6 separate structures across the site, including insulated panels on the Observation tower.  Buildings by Chief.

Classroom Building


Covered Viewing


Latrine

Ammo Transfer

Covered Mess with Stainless Steel Tables

 

 

The Associated General Contractors (AGC) of AmericaManhattan Chamber of CommerceWamego Chamber of Commerce
© 2011 Riley Constructionweb design: Imagemakers